同步投产脱硫工程的项目管理体会 被引量:1

Learning from Project Management of FGD Synchronized Commission
原文传递
导出
摘要 河北国华沧东发电有限公司2×600MW机组烟气脱硫工程,与主机组提前同步完成了168h试运行。能够达到上述目标,主要是实施过程中总承包单位采取了超前策划、精细化和专业化的项目管理,其中包括对进度计划管理,动态调整脱硫工程二、三级计划,加强与相关施工单位的合同管理,"严、细、实"的专业管理,及时排除消极因素和正确把握关键环节等措施,最终实现华北地区第1台同步投运的环保工程。 The FGD project in Hebei Guohua Cangdong Power Generation Co. Ltd. has completed 168 h trial operation in synchronization with the 2×600 MW main units. For the previous purpose, the general contractor executed the planning ahead, careful and specialized project management, including sehedule planned management, dynamic adjustment of the 2nd and 3rd class FGD planning, enhancement of contract management with related construction contractors, strict and practical specialized management. Also negative factors were eliminated and correct key links were held. As a result, the 1 st FGD project commission synchronized with the main units was realized in north China regions.
作者 郑恒
出处 《电力建设》 2009年第3期87-89,共3页 Electric Power Construction
关键词 同步投产 脱硫工程 项目管理 synchronized commission FGD project project management
  • 相关文献

参考文献6

  • 1DL5000-2000火电发电厂设计技术规程[S].北京:中国电力出版社.2001.
  • 2火电厂烟气脱硫工程技术规范石灰石/石灰-石膏法(HJ/T179-2005).北京:国家环保总局,2005.
  • 3电力建设工程施工技术导则[J],北京:中国电力出版社,2001.
  • 4金生祥,梅东升.谈基建调试项目部的建设与管理[J].电力建设,2006,27(2):53-54. 被引量:4
  • 5DL5009.1-1992电力建设安全工作规程(火力发电厂部分)[S].
  • 6DL/T5196-2004.火力发电厂烟气脱硫设计技术规程[S].[S].,..

共引文献48

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部