三峡工程施工设备的配件购置采用寄售管理方式,由于减少了采购过程的中间环节,生产厂商与合作单位的供需见面和引进厂商直接在工地设配件仓库,并以优惠单价进行配件寄售,降低了施工配件的成本,提高了设备的完好率和利用率,使供需双方均获得较大的经济效益。
The consignment management mode for the purchase of spare parts for the conStruction equipment has been applied to the Three Gorges Project, reducing the costs of the spareParts, improving the rate of equipment in good condition and the rate of utilization of equipMent, and obtaining good economic effect on the owner and the suppliers, which results fromSimplifying the intermediate links of purchase, directly contacting between the manufactruersAnd the cooperative units, the spare parts warehouses at site established by the manufacturesrs,And preferential prices.
出处
《中国三峡建设》
1998年第2期30-31,共2页
China Three Gorges Construction
关键词
寄售配件
管理方法
施工设备
三峡工程
Consignment of spare parts Management mode Directly contacting between supplier and client