摘要 三峡工程导流底孔布置在泄洪坝段,共22孔,运行条件复杂,布置上需满足泄流能力和截流落差要求,同时还兼顾下游水流衔接与下游消能防冲。通过对长有压管导流底孔3种优化体型试验结果分析,将进口高程、鼻坎挑角和鼻坎高程各不相同的3种体型导流底孔组合布置,其中两个边孔为出口挑角和鼻坎高程最大的体型3,中间16孔为出口挑角和鼻坎高程最小的体型1,其余4孔为体型2。经过局部整体模型验证,提出的导流底孔布置方案,满足了各项要求,为设计采用。 The diversion bottom outlets of the Three Gorges Project, 22 outlets in total, are arranged in the spillway dam section. Since the operation conditions of these outlets are very complicated, their arrangements need to meet requirements of discharge capacity and water drop at river closure gap, and also to take account of continuity condition of flow, energy dissipation and scour prevention downstream of the structures. By means of analysing the expeimental results of 3 optimized configurations of the diversion bottom outlets with a long pressure conduit,the three configurations different from each other in elevations at entrance and bucket lip and in deflection angle of the bucket are compositely arranged, of which 2 outlets of configuration 3 with greatest deflection angle and highest bucket lip elevation are distributed on the both sides of the dam section, 16 outlets of configuration 1 with least deflection angle and lowest bucket lip elevation are distributed on the central portion, the other 4 outlets are of configuration 2. The proposed layout scheme of the diversion bottom outlets has been verified by a locally comprehensive model, and meets all requirements. This composite arrangement is adopted by designers.
出处 《人民长江》 北大核心 1998年第5期1-2,共2页 Yangtze River
关键词 导流底孔 试验研究 三峡水利枢纽 布置方案 Diversion bottom outlet Optimum alternative Hydraulic model test Experimental research Sanxia Multipurpose Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部