期刊文献+

坝内埋管极限状态设计方法 被引量:2

The design method of limit state of the penstock embedded in dam
下载PDF
导出
摘要 本文在综合分析坝内埋管现行设计理论和方法的基础上,提出了坝内埋管极限状态设计方法.该方法以钢筋混凝土非线性分析为主要手段,可以同时考虑坝体荷载、内水压力、温度荷载的作用,全面分析坝内埋管中钢管、钢筋和混凝土的应力状态和承载情况,并决定钢管壁厚和外围坝体混凝土的配筋,它对于改进坝内埋管的强度设计,具有重要实际意义. Based on the comprehensive analysis of the current design theory and method for penstock embedded in dam, a design method of limit state has been brought forward in this paper. By means of the nonlinear finite element analysis of reinforced concrete, this method can be used to analyze the stress state and bearing capacity of the penstock embedded in dam under body load, internal water pressure and temperature load. The thickness of the penstock and reinforcement in concrete of the dam body can be determined. It has practical significance in improving the strength design of the penstock embedded in dam.\=
出处 《水利学报》 EI CSCD 北大核心 1998年第3期26-29,共4页 Journal of Hydraulic Engineering
基金 水利水电科学基金
关键词 压力管道 极限设计 水电站 坝内埋管 设计方法 penstock, limit design, safety, FEM.
  • 相关文献

参考文献5

  • 1马善定,水力发电学报,1992年,3期
  • 2过镇海,建筑结构学报,1988年,4期
  • 3伍鹤皋,水利水电技术,1988年,2期
  • 4团体著者,水电站压力钢管设计规范.SD144-85,1985年
  • 5团体著者,水工钢筋混凝土结构设计规范.SDJ20-78,1979年

同被引文献39

  • 1安旭文,侯建国,何英明,付少君,傅金筑,干城,蒋锁红.水电站压力钢管明管的可靠度校准分析[J].武汉大学学报(工学版),2003,36(6):31-35. 被引量:4
  • 2侯建国,宋础,刘晓春,秦晶.美国新版混凝土结构设计规范的完全度分析[J].工程建设标准化,2004(5):42-44. 被引量:2
  • 3GB150-1998.钢制压力容器[S].[S].,..
  • 4SD144-85.水电站压力钢管设计规范(试行)[S].[S].,..
  • 5DL/T5141-2001.水电站压力钢管设计规范[S].[S].,..
  • 6SL281-2003.水电站压力钢管设计规范[S].[S].,..
  • 7JB 4732-1995,钢制压力容器分析设计标准[S].
  • 8陆明万,寿比南.新一代的压力容器分析设计规范——ASME Ⅷ-2 2007简介[J].压力容器,2007,24(9):42-47. 被引量:26
  • 9傅金筑.《水电站压力钢管设计规范》(DL/T5141-2001)若干问题的讨论[C]//中国水电站压力管道第6届全国水电站压力管道学术论文集.北京:中国水利水电出版社,2006:1-6.
  • 10侯建国,何英明,安旭文,等.水电站压力钢管设计规范的可靠度校准和分项系数确定[J].水利水电勘测设计标准化,2001(3-4):13-36.

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部