摘要
黄河上游水力资源是我国水电建设的富矿,应为优先开发的重点。目前,我国水电建设体制还存在着资金需求与投资体制等突出的矛盾。在研究了李家峡水电站建设管理体制的变革过程后,提出了按照现代企业制度要求,利用李家峡水电站工程建设管理的丰富经验,建立、运作黄河上游水电梯级滚动开发机制的设想,以便加快开发速度,缓解电力严重不足的现象,振兴西北经济,为我国社会主义建设做出巨大的贡献。
The upstream of Yellow River is rich in hydropower resources and should be listed in the priority development region. At present, our hydropower construction system exists the contradictory of finance demands and investment system. After the changes of the construction management system of Lijiaxia Hydropower Station have been studied, the paper puts forward some thoughts on establishing and operating the rolling development mechanism in the hydropower step construction in the upstream of Yellow River according to the requirements of modern enterprise system and on the basis of making full use of the rich experience of the construction management of Lijiaxia Hydropower Station, which could accelerate the hydropower development and alleviate the power shortage so that it could make great contribution to promote the economic development in the northeast region and to our socialism build.
出处
《水力发电》
北大核心
1998年第5期1-3,共3页
Water Power
关键词
黄河上游
水电资源
滚动开发
现代企业制度
hydropower project, the upstream of Yellow River, hydropower resources, rolling development, modern enterprise system