三门峡水库泥沙问题 被引量:2

Sediment problems of the Sanmenxia Reservior
下载PDF
导出
摘要 三门峡枢纽建成后,库区泥沙淤积十分严重,经过2次改建,工程的泄流规模增大,315m高程泄量近10000m3/s,水库运行方式改为蓄清排浑运用。恢复了10亿m3的槽库容,潼关高程升降变化稳定,基本控制住了泥沙淤积的上延。由于枢纽上下游兴建了大型水利枢纽,改变了三门峡水库的入库水沙条件和运行条件,库区泥沙冲淤变化出现新问题,有必要进一步改善水库运行调度,适当调整非汛期和汛期的运用水位,缓解库区泥沙冲淤变化的不利影响,控制潼关高程继续上升,提高枢纽的综合利用效益。 Since completion of Sanmenxia Hydroproject,a very serious problem of the sediment accumulation has been occurred in the reservoir area.After reconstruction works has been twice,the discharge capacity of this project has been increased to about 10000m 3/s at El.315m,and the operation mode of clear water impounding and muddy flour releasing is adopted.The reservoir storage capacity about 1000×10 6m 3 has been restored and the variation of the river elevation extending to Tongguan is stabilized.Thus the upstream ward extension of sedimentation has been basically controlled.After construction of the large scale hydraulic key projects at both the upstream and downstream of the Sanmenxia Hydroproject on the Yellow River,water and sediment inflow condition as well as the reservior operation conditions has been changed tremendouy and at the same time,the new problem on the sediment scourring and silting of the reservoir area was occurred.It is necessery to further improve the reservoir operation and dispatching,to adjast the reservoir operation water levels at both the nonflood period and flood season,to reduce the adverse effect on varition of the sediment scourring and silting at the reservoir area,to control the reservior elevation rise at Tongguan stretch of the Yellow River,and to increase the comprehensive utilization benefits of the hydroproject.
作者 喻明湘
出处 《水利水电工程设计》 1998年第1期5-6,10,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 蓄清排浑 三门峡水利枢纽 水库泥沙 库区冲淤 variation of the sediment scourring and silting,clear water impounding and muddy flow releasing,water discharging scale,contain the reservoir storage,elevation of Tongguan stretch,Sanmenxia Hydroproject
  • 相关文献

同被引文献24

  • 1薛宁波,马清文,王成华.地质灾害易发山区群测群防体系与突发性灾害预警[J].中国水土保持科学,2008,6(z1):12-15. 被引量:13
  • 2吴保生,夏军强,王兆印.三门峡水库淤积及潼关高程的滞后响应[J].泥沙研究,2006,31(1):9-16. 被引量:24
  • 3姜乃森,傅玲燕.中国的水库泥沙淤积问题[J].湖泊科学,1997,9(1):1-8. 被引量:38
  • 4红领巾水库管理所 内蒙古水利勘测设计院.红领巾水库水沙利用和减淤措施[A].黄河泥沙研究工作协调小组.黄河泥沙研究报告选编.第一集.上册[C].,1978.79-91.
  • 5国家电力公司成都勘测设计研究院.金沙江溪洛渡水电站可行性研究报告-4工程任务和规模[R].,2001年12月..
  • 6国家电力公司成都勘测设计研究院.金沙江溪洛渡水电站专题研究报告-5水库泥沙专题研究报告[R].,2001年12月..
  • 7Mahmood K. Reservoir Sedimentation- Impact, Extent and Mitigation [ M ] .World Bank Fechnical Paper Number 71. Washington. D, C. 1987.
  • 8Morris G L and Fan J. Reservoir Sedimentation Handbook : Design and Management of Dams, Reservoirs, and Watersheds for Sustainable Use [ M ]. New York : McGraw-Hill, 1997.
  • 9陈朝辉,方国祥,李鑫华,温美丽,张俊香.广东山区大中型水库淤积与整治[J].热带地理,2007,27(5):429-434. 被引量:2
  • 10李朝秀.紧急排查地质灾害隐患和水利工程安全[N].杭州日报.2009-08-16.

引证文献2

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部