摘要
叙述了太钢电力厂二降压3号主变压器大修后从启动、故障处理到恢复送电的过程,分析了启动送电后跳闸故障原因,并提出了改进措施。
The process of the third transformer were described which was new repaired starting, handling and recovering in the second substation of Taigang Electric Power Plant, The causes of tripping were analyzed about the transformer, and improving methods were putforward.
出处
《山西冶金》
CAS
2009年第1期67-68,共2页
Shanxi Metallurgy