摘要
以工程地质地形地貌条件、施工材料质量控制为出发点,介绍了施工机具质量控制、预应力锚索施工方法、施工工艺流程,通过合理安排施工顺序,加快了施工进度,保证了施工质量,确保了资源的优化利用。
The author commences on the project geological, landform and physiognomy condition and construction material quality control, introduces the construction machine quality control, pre-stressing anchor construction method, and construction technology schedule, based on the reasonable arrangement of construction schedule, it speeds up construction process, ensures construction quality, and guarantees the optimal utilization of resources.
出处
《山西建筑》
2009年第9期357-359,共3页
Shanxi Architecture
关键词
水电站
边坡防护
危岩体
随机锚索
施工方法
hydropower station, slope protection, damage rock mass, random anchor, construction method