期刊文献+

防坠器综合测试仪在长平矿副井的应用 被引量:3

Application of Parachute's Comprehensive Testing Instrument in Subsidiary Shaft of Changping Mine
下载PDF
导出
摘要 针对过去传统的人工测量方法存在的弊端,采用防坠器综合测试仪基于虚拟技术的测试方法,对副井防坠器进行空载重载脱钩试验,通过试验曲线得到准确的制动减速度和空行程时间,可以准确地判断防坠器性能的好坏,为矿井安全运行提供科学的保障。 Aiming at the shortage of traditional manual measuring method, a new parachute ' s comprehensive test instrument was designed based on the theory of virtual. The unhooking experiments of unload and heavy load were performed on the subsidiary shaft parachute. The accurate braking deceleration and empty stoke time were obtained from the experiment curve, which determine the performance of the parachute with accuracy and supply the safeguard with the mine hoist.
出处 《煤矿机械》 北大核心 2009年第3期165-166,共2页 Coal Mine Machinery
关键词 防坠器 制动减速度 试验 空行程时间 parachute braking deceleration experiment empty stoke time
  • 相关文献

参考文献4

二级参考文献2

共引文献4

同被引文献18

  • 1鲍四元,邓子辰.由纵向振动引起的质点与圆锥形杆碰撞问题的解析解[J].应用数学和力学,2006,27(7):812-818. 被引量:5
  • 2任中华,王雷,陈义强,杨建奎.防坠器现场试验及其安全性能评价[J].煤矿机械,2007,28(6):78-79. 被引量:7
  • 3MANKOWSKI R R, COX F J. Response of mine hoisting cables to longitudinal shock loads [J]. Journal of the South African Institute of Mining and Metallurgy, 1986, 86(2): 51-60.
  • 4KACZMARCZYK S, OSTACHOWICZ, W. Transient vibration phenomena in deep mine hoisting cables [J]. Journal of Sound and Vibration, 2003, 262(2): 219-289.
  • 5Zhao Wenli. Kinetostatics and analysis methods for the impact problem [J]. European Journal of Mechanics - A/Solids, 1999, 18(2): 319-329.
  • 6YIN X C, WANG L G. The effect of multiple impacts on the dynamics of an impact system [J]. Journal of Sound and Vibration. 1999, 228(5): 995-1015.
  • 7沈惠霞.防坠器制动性能智能检测系统研究[D].中国矿业大学,2005.
  • 8LM2576/LM2576HV Series SIMPLE SWITCHER (r) 3A Step-Down Vottage Regulator. National Semi-condutor 1999.
  • 9弗·符·弗洛林斯基.矿井提升钢绳动力学[M].杨福新,译.北京:煤炭工业出版社,1957.
  • 10潘英.提升钢丝绳最大动张力的研究[J].中国矿业大学学报,1997,26(1):23-26. 被引量:7

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部