摘要
OMRON Controller Link总线能使PLC、计算机等节点间方便、灵活地发送和接收大容量数据,且具有较高的实时性、可靠性。介绍了Controller Link网络的设计方法,包括:硬件配置、通信连接、通信测试、编程等方法。
The OMRON Controller Lind bus, which has advantages of high real-time performance and reliability, enables sending and receiving bulk data among nodes of PLC and computers conveniently and flexibly. The design of the Controller Link network was presented, including the methods of hardware configuration, communication links, communication tests, and programming.
出处
《华东电力》
北大核心
2009年第2期276-278,共3页
East China Electric Power