摘要 针对深圳大运会体育场防雷设计的主要问题:引下线间距超规、运动场地全面保护、屋面板保护及雷电过电压作了分析。就大运会的防雷设计与规范要求的接触电压、跨步电压、磁场强度作对比,数值均小得多,说明设计是安全的,也指出了需要处理的问题。等电位联结对于降低跨步电压、接触电压和防止雷电反击是十分有效的措施。 Aiming at the main problems of lightning protection design of the Shenzhen Stadium for University Games: the space between the down-conductor systems out of specification, overall protection of the sport grounds, protection of the roof panel and lightning over- voltage are analyzed. By comparing the touch voltage, step voltage and magnetic field strength of the lightning protection design with those of the requirements in the specification, the designed values are much smaller, which demonstrates that the design is safe. The problems to be dealt with are also pointed out. Equipotential bonding is a very effective measure for reducing step voltage and touch voltage and preventing from counter-attack.
作者 林惠仁
出处 《建筑电气》 2009年第3期24-29,共6页 Building Electricity
关键词 引下线间距 分流系数 雷电电压 等电位联结 Space between down-conductor systems Shunt coefficient Lightning voltage Equipotential bonding
  • 相关文献

同被引文献10

  • 1中国建筑东北设计研究院,JGJ16-2008民用建筑电气设计规范[S].北京:中国建筑工业出版社,2008.
  • 2中国航空工业规划设计研究院.工业与民用配电设计手册[M].第3版.北京:中国电力出版社,2005:17-18.
  • 3中国新时代国际工程公司.GB50055-2011通用用电设备配电设计规范[S].北京:中国计划出版社,2012.
  • 4中机生产力促进中心.GB/T156-2007标准电压[S].北京:中国标准出版社.2008.
  • 5北京市电力技术交流会.工业企业和民用建筑电力设计计算手册[M], 1965.
  • 6朴德罗夫斯基.电机学[M].第3版.清华大学电力机械教研组,译,1957.
  • 7中国建筑设计研究院.GB50038- 2005 人民防空地下室设计规范[S].北京:国标图集出版社,2005.
  • 8北京市电力技术交流会.工业企业和民用建筑电力设计计算手册[M].1965.
  • 9朴德罗夫斯基.电机学[M].第3册.清华大学电力机械教研组译.1957.
  • 10北京市建筑设计研究院,等.GB50736-2012民用建筑供暖通风与空气调节设计规范[S].北京:中国建筑工业出版社.2012.