水工工程通航安全评估介入时机研究 被引量:3

Study on timing for navigation safety evaluation to be conducted for waterborne engineering
下载PDF
导出
摘要 水工工程通航安全评估介入时机影响通航安全评估工作的有效性。文中通过研究我国相关法规,分析了通航安全评估介入时机现状,依据相关法律、法规规定,结合通航安全评估实践和项目管理相关理论,对通航安全评估不同介入时机进行分析,提出分阶段实施通航安全评估的观点。 The timing waterborne engineering of navigation safety evaluation of contributes to the validity of the evaluation work. This paper, based on the study of laws and provisions concerning navigation safety management in China, provides the analysis on the present timing decision-making situation. It also describes the procedure for navigation safety evaluation and the relevant regulations it relies on, and puts forward the authors views on the correct timing for the navigation safety evaluation to be conducted and how a phased evaluation to be carried out.
出处 《中国海事》 2009年第2期65-68,共4页 China Maritime Safety
关键词 水工工程 通航安全 评估 时机 waterborne engineering navigation safety evaluation timing
  • 相关文献

参考文献5

  • 1乔晓阳.中华人民共和国行政许可法释义[M].北京:中国物价出版社,2004.117.
  • 2中华人民共和国海事局.中华人民共和国内河交通安全管理条例释义[M].北京:人民交通出版社,2004.
  • 3交通部.中华人民共和国海事行政许可条件规定[EB/OL].http://www.moc.gov.cn/zhuzhan/zhengwugonggao/jiaotongbu/jiaotongbuling/200709/t20070926_410910.html,2006-02-07.
  • 4中华人民共和国海事局.中华人民共和国海事局通航安全评估管理办法IEB/OL].http://www.law-star.com/cac/100010694.htm,2007-11-21.
  • 5蔡琦斌.浅议工程项目全生命周期管理[J].科学与管理,2007,27(4):129-130. 被引量:2

共引文献2

同被引文献10

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部