1Lauhoff H. Speed control on belt conveyor - Does it really saveenergy [J]. Bulk Solid Handling, 2005, 25 (6) : 368 ~ 377.
2ALLES, R. FSrdergurt - Berechnung ( Bulk materialcalculations). ContiTech, first edition 1979.
3HINT'Z, A. Einfluss des Gurtaufbaus auf den Energieverbrauch yon Gurff'rderanlagen ( Influence of the belt configuration on the energy consumption of belt conveyor systems). Thesis, Hanover University 1993.
4B. Van Den Heuvel. Investigationa dealing with variable - speed drives of belt conveyor system [ J ]. World of Mining, 2006 (2): 105-113.
9de ALMEIDA A T,FERREIRA F J T E,BOTH D.Technical and eco- nomical considerations in the application of variable-speed drives with electric motor systems.Industry Applications ,2005,44( 1 ) :188-199.
10ZHANG S R,XIA X H.Optimal control of operation effieiemT,' of beh conveyor systems.Applied Energy, 2010 ( 87 ) : 1929-1937.