摘要 并行工程是对产品设计及其相关过程进行并行、一体化设计的一种系统化工作模式,正作为工期压缩技术应用于建筑工程设计中。设计结构矩阵是可用于并行工程设计信息流分析的工具,然而,目前很多基于设计结构矩阵的模型并未考虑到成本和工期的不确定性,且无法很好地描述实际的并行设计过程。为解决该问题,提出了由遗传算法和蒙特卡洛模拟构成的工序优化模型,使并行工程设计过程中工序得到最优化。其中,遗传算法引入模型用于确定时间和成本目标函数下最优的工作顺序;蒙特卡洛模拟则用于解决工作时间和成本随机的问题。还引入返工概率、返工百分比、搭接矩阵、学习曲线和不确定的工期和成本等描述实际设计过程的特征,给出主要影响总工期和成本的返工量以及总时间和成本计算的具体算法。并应用于工程案例,输出结果验证了模型的有效性,为并行工程优化设计工序提供了新的有效的工具。 Concurrent engineering (CE) is a systematic pattern where the processes of product development and related processes are concurrent and integrated. CE is becoming one of the schedule compression techniques in construction design. The design structure matrix (DSM) is a tool that helps in understanding and analyzing the information flow in CE design. However, many existing DSM-based models do not consider the uncertainty of cost and time, and failed to adequately describe the realistic design process. An optimization model including Genetic Algorithm (GA) and Monte Carlo simulation (MC) is presented to obtain an optimization sequence of design process for CE projects. GA is used to obtain an optimization sequence, and MC is incorporated into the framework to tackle project activities with stochastic time and cost. An algorithm is developed to calculate the rework affecting the total time and cost. Rework probability, rework impact, overlapping matrix, improvement curve and uncertainty time and cost are introduced to represent the characteristics of design process. A case study verified the validity of the proposed model. The framework provides a new effective tool for design process sequencing optimization in CE projects.
机构地区 华北电力大学
出处 《土木工程学报》 EI CSCD 北大核心 2009年第2期139-144,共6页 China Civil Engineering Journal
基金 国家自然科学基金 (70572090)
关键词 建设项目 并行工程 工程设计 优化 construction project concurrent engineering engineering design optimization
  • 相关文献

参考文献8

  • 1Kamara J M,Anumba C J,Evbuomwan N F O.Assessing the suitability of current briefing practices in construction with a concurrent engineering framework[J].International Journal of Project Management,2001,19(6):337-351.
  • 2Maheswari J U,Varghese K,Sridharan T.Application of dependency structure matrix for activity sequencing in concurrent engineering projects[J].Journal of Construction Engineering and Management,2006,132(5):482-490.
  • 3Winner R I,Pennell J P,Bertrand H E,et al.The role of concurrent engineering in weapons system acquisition[R].Virginia:Institute for Defense Analyses,1988.
  • 4Altus S S,Kroo I M,Gage P J.A genetic algorithm for scheduling and decomposition of muhidisciplinary design problems[J].Journal of Mechanical Design,1996,118 (4):486--489.
  • 5Austin S,Baldwin A,Li B,et aL Analytical design planning technique (ADEPT):a dependency structure matrix tool to schedule the building design process[J].Construction Management and Economics,2000,18 (2):173-182.
  • 6Steward D V.System analysis and management:Structure,strategy and design[M].New York:Petrocelli Books,1981.
  • 7Browning T R,Eppinger'S D.Modeling impacts of process architecture on cost and schedule risk in product development[J].IEEE Transactions on Engineering Management,2002,49(4):428-442.
  • 8Meier C,Yassine A A,Browning T R.Design process sequencing with competent genetic algorithms[J].Journal of Mechanical Design,2007,129(6):566-585.

同被引文献93

  • 1姚咏,范文慧,熊光楞.复杂产品开发过程仿真及其优化方法研究[J].系统仿真学报,2006,18(3):726-730. 被引量:20
  • 2许晓燕,赵武,姜迎春,郭友晋.基于过程的协同技术在产品质量管理中的应用[J].工业工程,2007,10(2):97-101. 被引量:3
  • 3张汉鹏,邱菀华.基于DSM优化的产品开发两因素风险建模及仿真[J].北京航空航天大学学报,2007,33(5):627-630. 被引量:3
  • 4Hanna A S, Camlic R, Peterson P,et al. Cumulative effect of project changes for electrical and mechanical construction [J]. Journal of Construction Engineering and Management, ASCE, 2004,130(6): 762-771.
  • 5William Ibbs C, Wong C K, Kwak Y H. Project change management system [ J ]. Journal of Management in Engineering , ASCE, 2001, 17(3): 159-165.
  • 6Kartam N A. Making effective use of construction lessons learned in project life cycle [ J ]. Journal of Construction Engineering and Management, ASCE, 1996, 122(1): 14-21.
  • 7Motawa I A, Anumba C J, Lee S, et al. An integrated system for change management in construction [ J ]. Automation in Construction, 2007, 16(3) : 368-377.
  • 8Cho S H, Eppinger S D. Product development process modeling using advanced simulation [ C]// Proceedings of 2001 ASME Design Engineering Technical Conference, 2001.
  • 9Smith R P,Eppinger S D. Deciding between sequential and parallel tasks in engineering design [ J ]. Concurrent Engineering: Research and Applications, 1998, 6( 1 ): 15-25.
  • 10Isaksson O, Keski-Seppala S, Eppinger S D. Evaluation of design process alternatives using signal flow graphs [ J ]. Journal of Engineering Design, 2000, 11 ( 3 ) : 211-224.

引证文献13

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部