既有东北铁路多年冻土区路基病害整治效果研究 被引量:7

Measures for roadbed problems of railways in permafrost regions of Northeast China
下载PDF
导出
摘要 既有东北铁路牙林线、嫩林线多年冻土区路基病害严重,借鉴青藏铁路建设的成功经验,利用热棒、保温板及保温护道等综合防治措施进行了路基病害整治。针对牙林线北段试验工程,利用观测断面实测地温资料对试验段综合防治措施效果进行分析。分析表明:防治措施效果明显,有效控制了路基下伏多年冻土地温,冻土上限明显抬升,对保证铁路正常运营发挥了积极作用。 The roadbed problems of railways are very serious in the permafrost regions of Northeast China. Manifold measures are applied in the experimental project to solve the roadbed problems based on the successful experience of Qinghai-Tibet Railway. There are two sections (274K500 m-275K000 m, 275K460-276K000 m) in the experimental project in the north region of Yaling Railway. Some active measures such as insulated materials (XPS, EPS) and two-phase closed thermosyphons are applied in these two sections. The ground temperature data of long-term monitoring of the experimental project indicate that the measures can effectively reduce the ground temperature of the permafrost under the roadbed and the thickness of the active layer. And the analytic results indicate that the measures are helpful to the stability of railways.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2009年第3期475-479,共5页 Chinese Journal of Geotechnical Engineering
基金 教育部新世纪优秀人才计划项目(NCET-05-0092) 国家自然科学基金项目(50678020) 铁道部科技研究开发计划项目(2003G033)
关键词 多年冻土 路基病害 防治措施 热棒 保温板 permafrost roadbed problem measure thermosyphon insulated material
  • 相关文献

参考文献3

二级参考文献60

  • 1温智,盛煜,吴青柏.青藏铁路路基浅地表热状态动态监测初步分析[J].岩石力学与工程学报,2003,22(z2):2664-2668. 被引量:18
  • 2李永强,韩龙武,崔珑,贾海锋.热棒在青藏高原风火山地区的实测效果分析[J].岩石力学与工程学报,2003,22(z2):3669-3672. 被引量:32
  • 3潘卫东,连逢愈,邓宏艳,余绍水,张先军.寒区工程中热棒技术的应用原理和前景[J].岩石力学与工程学报,2003,22(z2):2673-2676. 被引量:28
  • 4吴青柏,童长江.冻土变化与青藏公路的稳定性问题[J].冰川冻土,1995,17(4):350-355. 被引量:84
  • 5杨海蓉.多年冻土地区防治路基融化下沉及提高其稳定性的措施.冰川冻土,1985,:7-7.
  • 6吴紫汪 刘永智.青藏公路沥青路面多年冻土路基变形预报[A]..第三届全国冻土学术会议论文集[C].北京:科学出版社,1989.333-338.
  • 7李树德.青藏公路多年冻七年平均地温和厚度[A]..中国地理学会冰川冻土学术会议论文集[C].北京:科学出版社,1983..
  • 8Yuanming Lai, Qiusheng Wang, Fujiu Niu, et al. Three-dimensional nonlinear analysis for temperature characteristic of ventilated embankment in permafrost regions [J].Cold Regions Science and Technology,2004,38:165-184.
  • 9Heuer C E, The application of heat pipes on the Trans Alaska pipeline[R]. CRREL Report, 1979.
  • 10丁靖康.冻土地区热桩技术的应用[R].兰州:中铁西北科学研究院,1991..