期刊文献+

PDMDAAC-MBBR组合工艺处理印染废水 被引量:6

Combined process of PDMDAAC and MBBR for wastewater treatment
下载PDF
导出
摘要 采用聚二甲基二烯丙基氯化铵(PDMDAAC)-移动床生物膜反应器(MBBR)组合工艺处理印染废水,考察了填料填充比例、水力停留时间(HRT)、PDMDAAC投加量、进水COD和NH3-N浓度对反应器处理效果的影响。结果表明,在填料填充比例为60%(体积比),单级反应器水力停留时间为24 h,PDMDAAC投加量为0.8 g/L的条件下,组合工艺对色度、COD和NH3-N的去除率分别达到97%、92%和90%。出水CODCr和NH3-N平均浓度分别低于50 mg/L和15 mg/L,达到了GB 4287—1992《纺织染整工业水污染物排放标准》的一级排放标准。 The combined process of poty dimethyldiallylammonium chloride (PDMDAAC) and moving bed biofilm reactor( MB- BR) was applied to the treatment of dyeing effluents,the influences of filling proportion of carrier, hydraulic retention time (HRT) ,the dosage of PDMDAAC,COD value and NH3-N concentration of feeding water on the treatment efficiency were in- vestigated. The results showed that under the conditions of filling proportion of carrier 60% ( volume ratio), HRT in single reac- tor 2.4 h,the dosage of PDMDAAC O. 8 g/L,MBBR could operated very steadily and good efficiency could be achieved with the removal of color, COD and NH3-N at 97%, 92% and 90% respectively. The discharged water could meet the first class criteria specified in discharged standard of water pollutants for dyeing and finishing of textile industry (GB 4287--1992 ) with COD and NH3-N less than 50 mg/L and 15 mg/L respectively.
出处 《印染》 北大核心 2009年第6期36-38,共3页 China Dyeing and Finishing
关键词 染整 废水处理 絮凝剂 生物膜反应器 dyeing and finishing wastewater treatment flocculant biofitm reactor
  • 相关文献

参考文献5

二级参考文献35

  • 1吕晓辉,胡龙兴.移动床生物膜反应器脱氮除磷技术[J].化学工程师,2004,18(9):20-22. 被引量:14
  • 2蔡冬鸣,李圭白.废电池中回收的锰氧化物对印染废水脱色研究[J].哈尔滨工业大学学报,2004,36(11):1527-1530. 被引量:12
  • 3刘旦玉,朱文亭,郭东敏.好氧移动床膜生物反应器的性能研究[J].工业水处理,2005,25(8):17-20. 被引量:1
  • 4戴海平,孙方,耿锋,周顺,邬晶.膜技术用于处理牛仔布印染废水[J].天津工业大学学报,2005,24(5):87-89. 被引量:9
  • 5[1]H.Ф deegaard.Advanced compact wastewater treatment based on coagulation and moving bed biofilm processes.Water Science and Technology Vo142 No12 pp33~48
  • 6[5]M.X.Loukidou,A.I.Zouboulis.Comparision of Biological Treatment Processes using Attached-growth Biomass for Sanitary Landfill Leachate Treatment.Environmental Pollution 111(2001):273~281
  • 7[8]Yutaka Suzuki et al,Development of Simulation Model for a Combined Activated-Sludge and Biofilm Process to Remove Nitrogen and Phosphorus Water Environment Research Vo1.71 No.4 1999.7/8 pp388~397
  • 8[9]H.Helness,H.Qd egaard Biological Phosphorus Removal in a Sequencing Batch Moving Bed Biofilm Reactor.Water Science & Technology Vo1.40,No,4~5,pp:161~168
  • 9[10]G.Andreottola et al.Upgrading of a Small Wastewater Treatment Plant in a Cold Climate Region Using a Moving Bed Biofilm Reater(MBBR) System.Water Science & Technology Vo141 No 1 pp177~185
  • 10[11]C.S.RA et al.Biological Nutrient Removal with an Internal Organic Carbon Source in Piggery Wastewater Treatment.Wat.Res.Vo1.34,No.3,pp.965~973,2000

共引文献110

同被引文献78

引证文献6

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部