期刊文献+

浅谈北京某大厦网壳结构安装施工工艺

On the reticulated shell structure fixing construction technique of an edifice in Beijing
下载PDF
导出
摘要 对北京某大厦中庭屋盖三向网格单层柱面网壳结构的安装施工流程、施工准备工作进行了分析,重点阐述了累积滑移的施工步骤,说明了累积滑移施工是网壳工程安装过程中的重中之重,合理的滑移设备及合理的施工工艺对整个安装过程起着至关重要的作用。 It analyses the fixing construction process and preparatory work of the three-dimensional grids single-layer latticed reticulated shell structure of the atrium roof of an edifice in Beijing, puts an emphasis on the illustration of the construction steps of accumulative sliding, and introduces that accumulative sliding construction is the key in the fixing process of reticulated shell project and rational sliding equipment and suitable construction technique plays an important role in the whole fixing process.
作者 杨金红 丁为
出处 《山西建筑》 2009年第10期108-109,共2页 Shanxi Architecture
关键词 网壳结构 累积滑移 胎架 牵引装置 支座 reticulated shell structure, accumulative sliding, bed jig, traction devices, support
  • 相关文献

参考文献1

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部