为了有效地指导和管理水电工程施工生产,就水电工程图纸管理、施工图会审及技术交底、合同管理、水电工程施工技术方案及材料管理、进度及质量管理、工程变更管理等进行了论述,从而实现水电工程工期和质量的控制目标。
To effectively guide and manage hydraulic power project construction production, it illustrates hydraulic power project drawing management, consultation trial of engineering drawings, technological explanation, agreement management, hydraulic power project construction technical plan, material management, progress, quality management and project alternation management, .so as to realize the construction period and quality control of hydraulic project.