摘要 针对陕京二线工程建设中土建施工特点,讨论了阀室基础设计的创新、各种地基处理方案以及冬季施工问题,提出了解决这些问题的具体方案,认为这些方案对管道的土建施工具有一定的指导意义。 Characteristics of civil engineering in West-to-East Parallel Gas Pipeline are discussed.Aiming at the characteristics of civil engineering in the long distance gas pipeline,innovations for foundation design of valve control chamber,treatment techniques of foundations and winter construction are discussed and optimization in design of block concrete foundations are discussed.Concrete problems arisen and solutions in civil engineering construction of the pipeline are introduced at the same time.
作者 胡道华 罗滔
出处 《油气储运》 CAS 北大核心 2009年第3期73-75,共3页 Oil & Gas Storage and Transportation
关键词 输气管道 土建设计 施工 措施 gas pipeline,civil engineering,construction,measure
  • 相关文献

参考文献3

  • 1GB50021—2001.岩土工程勘察规范.[S].,..
  • 2SH3049—93石油化工企业建筑抗震设防等级分类标准.
  • 3GB50025—2004.湿陷性黄土地区建筑规范.[S].,..

共引文献11

同被引文献13

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部