摘要
深圳市横岭污水处理厂二期工程设计规模为40×104m3/d,采用DN/CN的BAF污水处理工艺。在工程设计中,借鉴了相关工程的设计经验,对各构筑物的设计参数进行了优化,为相关工程的设计提供了借鉴。
The design capacity of second-phase project of Shenzhen Hengling Wastewater Treatment Plant is 40 × 10^4 m^3/d, and the treatment process is BAF with DN/CN. In the engineering design, the experience of other engineering is used as reference, and the design parameters of the structures are optimized, giving a reference to design of similar projects.
出处
《中国给水排水》
CAS
CSCD
北大核心
2009年第6期37-40,共4页
China Water & Wastewater