摘要
介绍了风洞式烟气脱硫系统的工艺流程及原理,重点对烟气脱硫系统调试过程进行了阐述,为相关工程测试人员提供参考。
The principle of wind tunnel type flue gas desulfurization system in thermal power plants were introduced. The debugging process of the flue gas desulfurization system were analyzed especially. It would provide some reference for the same type flue gas desulfurization projects.
出处
《电力环境保护》
2009年第1期16-17,共2页
Electric Power Environmental Protection
关键词
湿法烟气脱硫
调试
方法
wet flue gas desulfurization
debugging
method