摘要
国内某电厂600MW机组凝汽器组合安装采用在凝汽器土建基础上直接搭设组合平台进行安装,这种组合方法与在A排外组合好后再往凝汽器土建基础处移送的方法不同,此方法将节省很多资源,加快施工进度,且能确保凝汽器整体的安装质量。
A combined method,which builds combined platform directly on condenser foundation,is used in the installation of the 600 MW unit condensers for some Power Plant.It is different from the method that transports the condenser assembled outside Row A to condenser foundation site.It saves many resources,speeds up schedule,and ensures installation quality.
出处
《电力建设》
2009年第1期66-68,共3页
Electric Power Construction
关键词
底板
侧板
隔板
管板
钛管
base plate
side plate
partition board
tube plate
titanium tube