期刊文献+

综合点目标和区域目标的多星观测调度 被引量:4

Multi-Satellite Scheduling Toward Spot and Polygon Observing Requests
下载PDF
导出
摘要 卫星遥感应用中存在点和区域两类任务,两类任务的调度方式存在区别,将二者综合调度困难。本文将点目标视为特殊的区域目标,将它们按照卫星观测机会分解成元任务,并将两类任务统一成元任务。根据任务类型分别构建收益函数,兼顾了二者在收益计算上的差异,从而建立综合模型对两类任务统一处理。根据问题特征,设计了具有多重分化机制的模拟退火算法进行求解,通过随机扰动、重排列及重启动三种分化机制,避免算法陷入局部最优,以得到更优解。实例验证了方法的有效性。 Remote sensing requests can be divided into two types: spot targets and polygon targets. Satellite observation scheduling toward these two kinds of targets are different, which makes it hard to schedule the two kinds of requests synthetically. In this article, an integrated model was proposed to deal with two kinds of targets. The spot target is regarded as a special polygon and can be divided into subtasks. The subtasks are generated according to the observing chance of the target, and be mapped into atomic task. Two evaluation functions are put forward to evaluate the profits of different targets. A muhi-diversifications simulate annealing algorithm is proposed for the satellite observation scheduling problem. Three diversification mechanisms: perturb, rearrange and restart, are defined to avoid the local optimum solutions, enlarge solution space also. Experiments results show the effectiveness of our approach.
出处 《宇航学报》 EI CAS CSCD 北大核心 2009年第2期754-759,共6页 Journal of Astronautics
基金 国家自然科学基金资助项目(70601035,70801062)
关键词 遥感卫星 调度 点目标 区域目标 分化机制 Remote sensing satellites Scheduling Spot targets Polygon targets Diversification mechanism
  • 相关文献

参考文献9

  • 1Cordeau J-F, Laporte G. Maximizing the value of an earth observation satellite orbit[ J]. Journal of the Operational Research Society, 2005, 56: 962- 968.
  • 2Globus A, Crawford J, Lohn J, et al. A comparison of techniques for scheduling earth observing satellites [ C ]//Proceedings of the 16th Conference on Innovative Applications of Artificial Intelligence, San Jose, CA, USA, 2004.
  • 3Gabrel V, Vanderpooten D. Enumeration and interactive selection of efficient paths in a multiple criteria graph for scheduling an earth observing satellite[ J]. European Journal of Operational Research, 2002, 139 : 533 -542.
  • 4Claire Rivett, Carmine Pontecorvo. Improving Satellite Surveillance through Optimal Assignment of Assets [ R ] ( DSTO-TR- 1488). Australian Government Department of Defense, 2004.
  • 5Lemaltre M, Verfaillie G. Selecting and scheduling observations of agile satellites, aerospace science and technology[ J]. 2002, 6:367 -381.
  • 6阮启明,谭跃进,李永太,陈英武,贺仁杰.基于约束满足的多星对区域目标观测活动协同[J].宇航学报,2007,28(1):238-242. 被引量:31
  • 7Bensana E, Verfaillie G, Bataillie N, et al. Exact and approximate methods for the daily management of an earth observing satellite[ C ]// Proceedings of SpaceOPS, Munich, Germany, 1996.
  • 8Globus A, Crawford J, Lohn J, et al. A comparison of techniques for scheduling earth observing satellites [ C ]//Proceedings of the 16th Conference on Innovative Applications of Artificial Intelligence, San Jose, CA,USA, 2004.
  • 9Kuipers E J. Algorithm for the management of the missions of Earth observation satellites[ C ]//Fifth ROADEF Annual Conference, Avignon, France, 2003.

二级参考文献15

  • 1李菊芳,谭跃进.卫星观测系统整体调度的收发问题模型及求解[J].系统工程理论与实践,2004,24(12):65-71. 被引量:25
  • 2郑昌文,李磊,徐帆江,丁明跃,苏康.基于进化计算的无人飞行器多航迹规划[J].宇航学报,2005,26(2):223-227. 被引量:29
  • 3Globus Al,Crawford J,Crawford J.Scheduling earth observing fleets using evolutionary algorithms:problem description and approach[C]// Proceedings of the 3rd International NASA Workshop on Planning and Scheduling for Space,NASA,2002
  • 4Globus Al,Crawford J,Lohn J.A comparison of techniques for scheduling earth observing satellites[C]// Proceedings of AAAI 2004,2004
  • 5Morris R A,Dung J,Dungan J.An integrated approach to earth science observation scheduling[C]// Proceedings of ESTC2003,2003
  • 6Walton J.Models for the management of satellite-based sensors[D].PH.D.Massachusetts:Massachusetts Institute of Technology,1993
  • 7Cohen R.Automated spacecraft scheduling-the aster example[R].Technical Report,Jet Propulsion Laboratory.Ground System Architectures Workshop,2002
  • 8Mancel C.Complex optimization problems in space systems[J].American Association for Aritficial intelligence,2003
  • 9Lema(i)tre M,Verfaillie G.Selecting and scheduling observations of agile satellites[J].Aerospace Science and Technology,2002,6:367-381
  • 10Fromherz,Markus P J.Constraint-based scheduling[C]// Proceedings of American Control Conference (ACC'01).Arlington,VA 2001

共引文献30

同被引文献37

引证文献4

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部