摘要
以某水电站隧道施工过程的工程实践为依据,对常规围岩变形监控量测及围岩变形跟踪监测系统进行了阐述,并对围岩表面二次应力场的现场测试及滞后变化监测作了研究,以期及时获取围岩变形动态信息。
Based on the engineering practices of a tunnel of water and electricity substation construction, discussion on the distortion monitor means and system on tunnel wall rock, and study the exterior secondary stress and the secondary stress ysteresis, so as to obtain the wail rock distortion dynamic information on time.
出处
《山西建筑》
2009年第11期300-302,共3页
Shanxi Architecture
关键词
隧道
围岩
变形监测
二次应力
tunnel, wall rock, distortion monitor, secondary stress