摘要 指出在桥涵接长施工前必须对施工可能影响路基稳定的线路进行加固,鉴于此,介绍了线路安全防护加固方法的构造特点,并对科学的检算方法作了深入探讨,通过理论计算,验证了防护桩设计的合理性。 Researchers point out that before the jointing in length construction of bridge and culvert, it must to get reinforcement on line which may have influences on subgrade stability, introduce the structural characteristics of line safety protection and reinforcement methods, and discuss the scientific check calculation methods deeply, based on the theory calculation, verify the rationality of fender pile design.
作者 顾晓君 高影
出处 《山西建筑》 2009年第11期339-340,共2页 Shanxi Architecture
关键词 既有桥涵 接长施工 挖孔桩 理论检算 existing bridge and culvert, jointing in length construction, digging pile, theory check and calculation
  • 相关文献

参考文献3

  • 1冯永利.浅谈桥梁加固[J].山西建筑,2008,34(2):326-327. 被引量:40
  • 2TB10001-99.铁路路基设计规范[S].[S].,..
  • 3TB10203-2002.铁路桥涵施工规范[S].[S].,..

二级参考文献5

共引文献212

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部