摘要 Global Positioning System (GPS) and Interferometric Synthetic Aperture Radar (InSAR), used for monitoring crust deformation, are found to be very promising in earthquake prediction subject to stress-forecasting. However, it is recognized that unless we can give reasonable explanations of these curious precursory phenomena that continue to be serendipitously observed from time to time, such high technology of GPS or InSAR is difficult to be efficiently used. Therefore, a proper model revealing the relation between earthquake evolution and stress variation, such as the phenomena of stress buildup, stress shadow and stress transfer (SSS), is crucial to the GPS or InSAR based earthquake prediction. Here we address this question through a numerical approach of earthquake development using an intuitive physical model with a map-like configuration of discontinuous fault system. The simulation provides a physical basis for the principle of stress-forecasting of earthquakes based on SSS and for the application of GPS or InSAR in earthquake prediction. The observed SSS associated phenomena with images of stress distribution during the failure process can be continuously simulated. It is shown that the SSS are better indicators of earthquake precursors than that of seismic foreshocks, suggesting a predictability of earthquakes based on stress-forecasting strategy. Global Positioning System (GPS) and Interferometric Synthetic Aperture Radar (InSAR), used for monitoring crust deformation, are found to be very promising in earthquake prediction subject to stress-forecasting. However, it is recognized that unless we can give reasonable explanations of these curious precursory phenomena that continue to be serendipitously observed from time to time, such high technology of GPS or InSAR is difficult to be efficiently used. Therefore, a proper model revealing the relation between earthquake evolution and stress variation, such as the phenomena of stress buildup, stress shadow and stress transfer (SSS), is crucial to the GPS or InSAR based earthquake prediction. Here we address this question through a numerical approach of earthquake development using an intuitive physical model with a map-like configuration of discontinuous fault system. The simulation provides a physical basis for the principle of stress-forecasting of earthquakes based on SSS and for the application of GPS or InSAR in earthquake prediction. The observed SSS associated phenomena with images of stress distribution during the failure process can be continuously simulated. It is shown that the SSS are better indicators of earthquake precursors than that of seismic foreshocks, suggesting a predictability of earthquakes based on stress-forecasting strategy.
出处 《Earthquake Science》 CSCD 2009年第1期53-62,共10页 地震学报(英文版)
基金 supported by the National Key Basic Research Science Foundation (No.2007CB209400) the National Natural Science Foundation of China (No.40638040,10672028) the Chinese Postdoctoral Science Foundation (No.20070421048)
关键词 stress-forecasting EARTHQUAKE stress buildup stress shadow stress transfer stress-forecasting earthquake stress buildup stress shadow stress transfer
  • 相关文献

参考文献12

  • 1S. C. Jaumé,L. R. Sykes.Evolving Towards a Critical Point: A Review of Accelerating Seismic Moment/Energy Release Prior to Large and Great Earthquakes[J].Pure and Applied Geophysics (-).1999(2-4)
  • 2C. G. Sammis,S. W. Smith.Seismic Cycles and the Evolution of Stress Correlation in Cellular Automaton Models of Finite Fault Networks[J].Pure and Applied Geophysics (-).1999(2-4)
  • 3Main I.Is the reliable prediction of individual earthquakes a realistic scientific goal[].Nature.1999
  • 4Peltzer G,Crampe F,Goffrey K.Evidence of nonlinear elasticity of the crust from the MW7.6 Manyi (Tibet) Earthquake[].Science.1999
  • 5Reilinger R E,Ergintav S,Burgmann R,McClusky S,Lenk O,Barka A,Gur-kan O,Hearn L,Feigl K L,Cakmak R,Aktug B,Ozener H,Toksoz M N.Coseismic and postseismic fault slip for the 17 August 1999,M=7.5,Izmit,Turkey Earthquake[].Science.2000
  • 6Scholz C H.Earthquake prediction: Feasible and useful[].Nature.1999
  • 7Abraham F F,Brodbeck D,Rafey R A,Rudge W E.Instability dynamics of fracture: A computer simulation investigation[].Physical Review Letters.1994
  • 8Crampin S.Stress-forecasting: An apparently viable third strategy[].Nature.1999
  • 9Harris R A,Day S M.Dynamic 3D simulations of earthquakes on en echelon faults[].Geophysical Research Letters.1999
  • 10Heimpel M.Critical behavior and the evolution of fault strength during earthquake cycles[].Nature.1997