对首钢2号高炉停炉99天后重新开炉的生产实践进行了总结。通过精心的开炉准备,并加强炉内操作和炉前出铁,2号高炉炉况很快恢复正常。
The paper summarizes the practice on re - startup of Shougang No. 2 BF after 99 day shutdown. Thanks to sufficient preparation for startup, improved furnace operation and cast house tapping, this blast furnace operation condition reconverts rapidly.
出处
《炼铁》
北大核心
2009年第2期1-6,共6页
Ironmaking
关键词
高炉
开炉
操作制度
blast furnace startup operation system