基于瓶颈负荷的BTO供应链响应时间优化 被引量:3

Optimizing the Response Time in BTO Supply Chain based on Bottleneck Control
下载PDF
导出
摘要 供应商生产的低效率是BTO供应链实际运作过程中的瓶颈,主要表现为供应链整体响应时间长和在制品库存高。针对该类供应链的瓶颈特点,利用排队模型建立了一种基于瓶颈负荷的BTO供应链响应时间优化策略。然后,通过算例分析了订单数量、等待订单数量和产能利用率,以及系统内的概率分布等参数对在制品库存水平和供应链整体响应时间的影响。最后,得出的结论表明,基于瓶颈负荷的控制对缩短供应链整体响应时间和在制品库存水平的控制均是有效的。 The low production efficiency of suppliers is the main bottleneck in the real production and operation progress of build-to-order supply chain(BTO supply chain). Two prominent problems are long response time of the whole supply chain and high work-in-progress (WIP) inventory level. An optimized response time strategy of BTO supply chain based on bottleneck control is proposed, which is expanded by the queue theory. The effects of parameters on both the level of WIP and the response time of the entire supply chain, such as order quantity in the queue, the waiting order quantity, production utilization and the probability distribution in the system etc. , were analyzed through numerical examples. Calculation results show that the bottleneck-based workload control is effective to control the level of WIP while to shorten the response time of the whole BTO supply chain at the same time.
出处 《管理学报》 CSSCI 2009年第4期435-439,共5页 Chinese Journal of Management
基金 国家863计划资助项目(2006AA04Z153) 国家自然科学基金资助项目(70672040)
关键词 瓶颈约束 BTO供应链 缩短整体响应时间 生产进度控制 bottleneck constraint BTO supply chain overall response time production control
  • 相关文献

参考文献12

  • 1GUNASEKARAN A,NGAI E W T.Build-to-order Supply Chain Management:A Literature Review and Framework for Development[J].Journal of Operations Management,2005,23(5):423~451.
  • 2WIGHT O.Input/Output Control:A Real Handle on Lead Time[J].Production and Inventory Management,1973,12(3):9~31.
  • 3KARNI R.Dynamic Algorithm for Input-Output Planning of Workstation Loading[J].AIlE Trans,1981,13(4):333~342.
  • 4WIENDAHL H P.Load-Oriented Production Control[M].Berlin:Springer-Verlag,1995.
  • 5ONUR L,FABRYCKY W J.An Input/Output Control System for the Dynamic-Job-Shop[J].IIE Trans,1981,19(1):88~97.
  • 6叶涛锋,韩文民.“按订单”生产方式下瓶颈资源的确定[J].工业工程与管理,2003,8(6):51-54. 被引量:17
  • 7GOLDRATT E M,JEFF C.The Goal:A Process of Ongoing Improvement[M].New York:North River Press,1984.
  • 8GOLDRATT E M.The Haystack Syndrome[M].MA:North River Press,1991.
  • 9GUPTA M.Constraints Management-recent Advances and Practices[J].International Journal of Production Research,2003,41(4):647~659.
  • 10MIL T.Comparing JIT,MRP and TOC and Embedding TOC into MRP[J].International Journal of Production Research,1997,35(4):1 147~1 169.

二级参考文献2

共引文献16

同被引文献39

  • 1朱伟华.论供应链的合理选择[J].湖南城市学院学报,2004,25(4):103-105. 被引量:1
  • 2张道海,何有世.浅谈我国电子制造业经营模式OEM[J].商业研究,2004(18):68-70. 被引量:2
  • 3殷晓红.OEM交易对OEM生产商的影响[J].辽宁工学院学报(社会科学版),2005,7(6):23-25. 被引量:3
  • 4朱海静,陈圻,蒋汨波.中国家电业OEM现状及发展对策[J].商业研究,2006(4):96-98. 被引量:13
  • 5吴青.我国制造业OEM研究[J].现代管理科学,2006(4):43-44. 被引量:5
  • 6Herbig P A, O'Hara B S. The Future of Original Equipment Manufacturers EJJ. Journal of Business & Industrial Market- ing, 1994, 9(3): 38-43.
  • 7Schili B, Dai F. Collaborative Life Cycle Management Between Suppliers and OEM[J]. Computers in Industry [J]. 2006, 57 : 725- 731.
  • 8Sousa R, Voss C A. Operational Implications of Manufactur- ing Outsourcing for Subcontractor Plants [J]. International Journal of Operations & Production Management, 2007, 27 (9), 974-- 997.
  • 9Zhai E, Shi Y, Gregory M. The Growth and Capability Devel- opment of Electronics Manufacturing Service (EMS) Compa- nies[J].International Journal of Production Economics, 2007, 107:1- 19.
  • 10Li Y. Leaning Trajectory in Offshore OEM Cooperation: Transaction Value for Local Suppliers in the Emerging Econo- mies [J]. Journal of Operations Management, 2010, 28:269 -282.

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部