5CAREY M. A model and strategy for train pathing with choice of lines, platforms, and mutes [ ] ]. Transportation Research-B, 1994, 28(5) : 333-353.
6CAREY M. A Model, algorithms and strategy for trainpathing[ J ]. Operational Res. Soc. , 1992, 46(8) : 988-1005.
7CAREY M. Extending a train pathing model from one- way to two-way track[ J]. Transportation Research-B, 1994, 28(5): 395-400.
8CHENG Yu. Hybrid simulation for resolving resource conflicts in train traffic reseheduling[J]. Computers Industry, 1998, 35 (3) : 233-246.
9MICHELE M A C. A Lagrangian heuristic algorithm for a real-world train timetabling problem [ J ]. Discrete Applied Mathematics, 2006, 154 ( 5 ) : 738-753.