期刊文献+

江苏宜兴抽水蓄能电站项目实施阶段概算控制 被引量:1

Budget Control in Project Implementation Stage of Jiangsu Yixing Pumped Storage Power Station
下载PDF
导出
摘要 抽水蓄能电站建设一次性投资大、工期长、不可预见因素多,概算控制及投资管理的难度大。宜兴抽水蓄能电站项目实施阶段建设单位采用了以下方法控制概算投资:严格按照可研批准的范围、规模、标准进行工程建设;编制《主体工程分标概算》控制主体工程静态投资;编制《合同及费用概算》控制项目总投资;正确处理造价与质量、工期、安全之间的关系;加强内部管理、创造良好的外部环境等,取得了良好的效果。 The construction of pumped storage power station is big in investment, long in construction period, more in unforeseen factors, and difficult in budget control and investment management. In the project implementation stage of the Yixing Pumped Storage Power Station, the construction unit adopted the following method to control the budget investment. The project construction was carried out strictly according to the scope, size and standards approved by the feasibility study. The Sub-bid Budget of Main Works was formulated to control the static investment of the main works. The Contract and Cost Budget was formulated to control the total investment of the project. The relations among cost, quality, construction period and safety should be correctly dealt with. The internal management should be strengthened and good external environment should be created. All these measures have achieved good effectiveness.
出处 《水力发电》 北大核心 2009年第2期15-17,共3页 Water Power
关键词 项目实施阶段 概算控制 建设单位 江苏宜兴抽水蓄能电站 implementation stage of project budget control construction unit Yixing Pumped Storage Power Station
  • 相关文献

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部