期刊文献+

江苏宜兴抽水蓄能电站程序化管理体系的创建与应用 被引量:1

Creation and Application of Programmed Management System for Yixing Pumped Storage Power Station
下载PDF
导出
摘要 为全面提升建设管理水平,江苏宜兴抽水蓄能电站建设管理单位在借鉴国内外先进管理模式和经验基础上,结合项目建设管理实际,大胆探索和创新,构建了一套集标准化、规范化、程序化于一体的科学、有效的程序化管理体系,并在实践中应用,取得明显效果。程序化管理体系的创建与应用,可供抽水蓄能电站建设管理参考。 In order to promote the level of construction and management of power station, the construction and management units of the Jiangsu Yixing Pumped Storage Power Station sets up a set of scientific and effective programmed management system integrated with standardization and program, based on using advanced management modes and experience at home and abroad for reference and in combination with actual conditions of project construction and management. This system was applied in the practice and gained good effectiveness. The creation and application of programmed management system could be used for reference for the constructors and managers of pumped storage power station project.
作者 何俊 高峰
出处 《水力发电》 北大核心 2009年第2期21-24,共4页 Water Power
关键词 电站建设管理 程序化管理体系 创建 应用 江苏宜兴抽水蓄能电站 construction and management of power station programmed management system creation apphcation Jiangsu Yixing Pumped Storage Power Station
  • 引文网络
  • 相关文献
;
使用帮助 返回顶部