摘要
根据工程特点,对原屋面系统进行优化,将6m结构体系改成12m,保证了工期、质量,降低了工程造价。
According to the characteristics of the project, the former roofing system is optimized and the 6-meter structural system is changed into 12-meter one, which have guaranteed the time limit for a project and the quality, and also reduced the project cost.
出处
《钢结构》
2009年第3期17-20,共4页
Steel Construction
关键词
1250热轧薄板
设计优化
节能
1250 hot rolled thin plate
design optimization
saving energy