摘要
拟定了混凝土面板堆石坝和碾压混凝土重力坝两种坝型,通过对坝址区地形、地质条件、筑坝材料、施工条件、主要工程量和总投资方面的综合比较,最终选定基本坝型为混凝土面板堆石坝。
This paper sketches two dam types, the concrete face rockfill dam and roller compacted concrete gravity dam, and through the comprehensive comparison of the landform and geological conditions of the dam site, the damming materials, the construction conditions, the main quantities of the construction, and the total investment, etc., selects the concrete face rockfill dam as the basic type of the dam.
出处
《科技情报开发与经济》
2009年第7期199-200,共2页
Sci-Tech Information Development & Economy
关键词
坝型比选
混凝土面板堆石坝
碾压混凝土重力坝
泽城水电站
comparison and selection of dam type
concrete face rockfill dam
roller compacted concrete gravity dam
Zeeheng Hydropower Station