泽城水电站枢纽坝型比较与选择 被引量:1

Comparison and Selection of the Type of Junction Dam in Zecheng Hydropower Station
下载PDF
导出
摘要 拟定了混凝土面板堆石坝和碾压混凝土重力坝两种坝型,通过对坝址区地形、地质条件、筑坝材料、施工条件、主要工程量和总投资方面的综合比较,最终选定基本坝型为混凝土面板堆石坝。 This paper sketches two dam types, the concrete face rockfill dam and roller compacted concrete gravity dam, and through the comprehensive comparison of the landform and geological conditions of the dam site, the damming materials, the construction conditions, the main quantities of the construction, and the total investment, etc., selects the concrete face rockfill dam as the basic type of the dam.
作者 冀永强
出处 《科技情报开发与经济》 2009年第7期199-200,共2页 Sci-Tech Information Development & Economy
关键词 坝型比选 混凝土面板堆石坝 碾压混凝土重力坝 泽城水电站 comparison and selection of dam type concrete face rockfill dam roller compacted concrete gravity dam Zeeheng Hydropower Station
  • 相关文献

参考文献3

  • 1SL228-98混凝土面板堆石坝设计规范[S].北京:中国水利水电出版社,1999.
  • 2SL274-2001碾压式土石坝设计规范[S].北京:中国水利水电出版社,2002:36-41.
  • 3DL5108-1999混凝土重力坝设计规范[S].北京:中国电力出版社,2000.