期刊文献+

川东高陡构造钻井工艺的合理配套探讨 被引量:2

A DISCUSSION ON THE REASONABLE MATCHING OF DRILLING TECHNOLOGY FOR THE HIGH STEEP STRUCTURES IN EAST SICHUAN
下载PDF
导出
摘要 川东地区高陡构造分布广、勘探前景可观,但复杂情况众多。文中根据高陡构造的地质构造特点和钻井地质特点,将高陡构造分为主体构造(Ⅰ类)和翼部潜伏构造(Ⅱ类)两类,推演其钻井工艺的合理技术配套方案。提出Ⅰ类构造应实施以清水强钻、钻具安全、深下技术套管和钻直井技术为主的配套技术,Ⅱ类构造则应实施利用地层自然造斜规律钻中靶井、综合治理井眼失稳、高效暂堵与保护产层、深部高压地层的井下动力钻具配金刚石钻头快速钻进技术。希望对川东地区今后的钻井工作起到一定的参考作用。 In East Sichuan,the high steep structures are widespread,their exploration prospects being considerable ,but the geological conditions are complex.According to the properties of geological structure and drilling geology of the high steep structures,they are divided into two types,i.e.the major structures (Type Ⅰ) and flank buried structures(Type Ⅱ),and their reasonable technique matching plans of drilling technology are deduced respectively.It is proposed that the matching techniques of the water pressurization drilling,drilling tool safeguard,deepening protective casing and drilling straight hole are mainly carried out for Type Ⅰ structures,and those of the drilling medium target wells by use of formation′s natural deflecting rule,comprehensively harnessing borehole destabilizing,highly efficient temporary plugging and a rapid drilling technique by downhole power drilling tools with a diamond bit for protecting payzones and deep high pressure formations are put into effect for Type Ⅱ structures,which will play a reference role in drilling in this region in the future.
作者 韩烈祥
出处 《天然气工业》 EI CAS CSCD 北大核心 1998年第2期32-35,共4页 Natural Gas Industry
关键词 气井 钻井工艺 构造运动 高陡构造 地质学 ichuan,East,Steep dip,Structure,Drilling engineering,Geology
  • 相关文献

参考文献2

二级参考文献2

  • 1包茨,杨先杰,李登湘.四川盆地地质构造特征及天然气远景预测[J]天然气工业,1985(04).
  • 2杨先杰,潘祖福.川东陡构造石炭系勘探的前景[J]天然气工业,1984(01).

共引文献22

同被引文献15

  • 1曾明昌,曾时田,毛建华.气井喷漏同存的处理技术研究[J].天然气工业,2005,25(6):42-44. 被引量:31
  • 2王业众,康毅力,游利军,刘加杰.裂缝性储层漏失机理及控制技术进展[J].钻井液与完井液,2007,24(4):74-77. 被引量:79
  • 3金衍,陈勉,刘晓明,李再均.塔中奥陶系碳酸盐岩地层漏失压力统计分析[J].石油钻采工艺,2007,29(5):82-84. 被引量:36
  • 4林安村.“吊灌”法在完井和堵漏作业中的应用[J].天然气工业,1983,3(1):31-33.
  • 5Reyna E. Case history of floating mud cap drilling techniques: Ar- dalin Field, Timan Pechoran Basin, Russia[C]//SPE/IADC Drilling Conference, 28 February-2 March 1995, Amsterdam, The Nether- lands. DOI:http://dx.doi.org/10,2118/29423-MS.
  • 6Sweep MN, Bailey JM, Stone CR. Closed hole circulation drill- ing: Case study of drilling a high-pressure fractured reservoir-Ten- giz Field, Tengiz, Republic of Kazakhstan[C]//SPE/IADC Drilling Conference, 19-21 February 2003, Amsterdam, The Netherlands. DOI:http://dx.doi.org/10,2118/79850-MS.
  • 7Runtuwene M, Suprihono S, Rizka D, PrasetiaAE, Toralde JS, Nas SW. Pressurized mud cap drilling drastically reduces non-pro- ductive time in Soka Field, South Sumatera[C]//Middle East Drill- ing Technology Conference & Exhibition, 26-28 October 2009, Manama, Bahrain. DOI:http://dx.doi.org/10,2118/125311-MS.
  • 8Darmawan GR, Susilo SD, Toralde JS. Successful installation and operation of downhole isolation valve combined with pressurized mud cap drilling to safely develop sour gas, fractured-limestone reservoir in Gundih Field, Indonesia[C]//SPE European Health, Safety and Environmental Conference in Oil and Gas Explo- ration and Production, 22-24 February 2011, Vienna, Austria.
  • 9林安村.川渝油气田井控工艺技术反思[J].钻采工艺,2008,31(2):21-23. 被引量:3
  • 10张恒晨,曾明昌,张本杰.川东天然气勘探新区钻井技术发展战略研究[J].天然气工业,1997,17(5):39-43. 被引量:4

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部