地铁盾构隧道下穿铁路的安全措施 被引量:31

Safety Measures in Tunnel Shield Crossing the Underground of Railways
下载PDF
导出
摘要 结合南京地铁2号线东延线盾构隧道下穿宁芜铁路工程,分析了盾构掘进对铁路的影响,阐述了穿越施工中所采取的安全措施。为避免轨道出现过大变形,对轨下盾构穿越区进行全断面分区注浆及旋喷加固,并在此基础上对轨道结构架设D型便梁进行防护。结果表明,所采取的安全措施有效地减小了轨道变形,确保了盾构施工及铁路行车安全。 Base on the shield tunnelling project of Nanjing metro Line 2 (the east extension)which crosses the underground of the railway between Nanjing and Wuhu, this paper analyses the effect of shield advancing on railways and describes the safety measures in the process of shield crossing construction. To avoid excessive displacement in track caused by the construction, the area under tracks is strengthened by injection and jet grouting, and the D-type auxiliary dirder is erected under the track on the base of ground consolidation. As the result shows, the safety measures have effectively decreased the displacement of tracks, and ensured the safety of shield construction and railway operation as well.
作者 佘才高
出处 《城市轨道交通研究》 北大核心 2009年第4期33-36,共4页 Urban Mass Transit
关键词 盾构隧道 安全措施 地基加固 D型便梁 shield tunnel safety measures ground consolidation D-type auxiliary dirder
  • 相关文献

参考文献7

二级参考文献16

共引文献215

同被引文献184

引证文献31

二级引证文献233

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部