摘要
介绍了钢铁企业工业净循环冷却水处理站两种工艺流程和投产前、联动试车过程,并对调试中出现的问题和解决办法作了分析。
The two technologic processes of the treatment station for clean industrial circulating cooling water of iron and steel enterprise, and combined trial running before commissioning were presented. Problems in trial running and solving methods were analyzed.
出处
《冶金动力》
2009年第2期64-66,69,共4页
Metallurgical Power
关键词
钢铁企业
工业净循环冷却水处理站
生产调试
iron and steel enterprise
treatment station for clean industrial circulating cooling water
trial running of production