本文利用随时间调整的有效模量法,结合有限元步进法,编制了钢—混凝土结合梁时效分析程序,以一座三跨连续钢—混凝土结合梁桥为例,分析了成桥到成桥后10年其截面应力和变形的变化情况。
Described in this article is a program for time - dependent analysis of steel - concrete composite beams developed using the age - adjusted effective modulus and the step - by - step finite element method. A three - span conctinuous steel - concrete composite beam bridge is analized of the variation of the sectional stress and deformation on completion of the bridge and ten years later.
出处
《中国市政工程》
1998年第1期32-35,共4页
China Municipal Engineering
关键词
钢-混凝土
结合梁
时效分析
步进法
截面应力
steel-concreat composite beam,time-dependent analysis,step-by-step method