摘要 使用计算流体软件Flowmaster 7.5模拟了某压水堆核电站的化学和容积控制系统(RCV)以及安全注入系统(RIS)。通过将正常工况下的模拟计算结果与设计参考值进行对比,验证了模型的可靠性。使用该模型预测了发生蒸汽发生器传热管破裂事故(SGTR)后安全注入模式转为上充模式时最大上充流量与一回路压力的关系,并定量比较了采用不同数量的低压安注泵为上充泵增压时最大上充流量和相应主泵密封注入流量与一回路压力的关系。 RCV System and RIS System are simulated with CFD software Flowmaster7.5,and the model is validated with design data.The relationship between maximum charging flowrates and Reactor Coolant System pressure is predicted by this model,when the safety injection mode switches to the charging mode after SGTR,and the relationship between the maximum charging flowrates and the corresponding Reactor Coolant Pump Seal Injection and the Pressure of Reactor Coolant System are quantitatively compared,when the charging pump is pressurized by various low voltage safety injection pumps.
出处 《核动力工程》 EI CAS CSCD 北大核心 2010年第S1期73-76,82,共5页 Nuclear Power Engineering
  • 相关文献

参考文献2

二级参考文献2

  • 1王志刚 李军 李丽娟.RCV最小下泄流量随一回路压力的关系.核工程研究与设计,2009,1:34-38.
  • 2苏林森,杨辉玉,王复生等.900MW压水堆核电站系统与设备[M].北京:原子能出版社,2005.

共引文献8

同被引文献16

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部