摘要
"5·12"汶川特大地震给巴蜀江油发电厂造成严重损害,机组房顶、烟囱、水塔、除尘器等设备设施都受到严重损坏,4台机组全部停运。对电厂恢复生产关键技术方案研究等方面情况进行介绍。
The "5.12" Wenehuan earthquake brought serious damages to Jiangyou Power Plant, particularly to the turbine house roof, the stack, the cooling tower and ESP. All four units were forcibly shutdown. Some key technical measures adopted to restore the power generation are introduced.
出处
《四川电力技术》
2009年第2期85-87,共3页
Sichuan Electric Power Technology
关键词
地震损失
恢复发电
方案研究
earthquake losses
power generation restoration
key measures