摘要
以徐州彭城电厂三期工程1 000 MW超超临界机组为例,介绍机组在各种启动工况下的特点,以及启动过程中需要注意的事项,为机组的安全、快速启动作出了一定的尝试与探索,供同类型机组的启动工作参考。
Taking the 1 000 MW ultra-supercritical units in Xuzhou Pengcheng Power Plant Ⅲ project as an example,the article introduces the characteristics of various start-up conditions and points for attention.Attempt and exploration was made for safe and quick start-up,which offers a reference to the same type units.
出处
《湖南电力》
2010年第S1期14-18,共5页
Hunan Electric Power