本文介绍1 000 MW超超临界汽轮发电机组调试过程中遇到的若干问题及处理方法,其中涉及到设备安装不规范、初始设计制造有缺陷、检修或运行操作不当等原因,为同类机组的安装、调试、运行提供借鉴。
The fault analysis and treatment on debugging for the 1 000 MW ultra-supercritical steam turbine-generator units are introduced,which is related to improper equipment installation,flaws of initial design and manufacture,overhaul or operation.It provides experience to installation,debugging and operation for the same kind units.
出处
《湖南电力》
2010年第S1期52-56,共5页
Hunan Electric Power
关键词
超超临界
汽轮发电机组
调试
ultra-supercritical
steam turbine-generator unit