基于管井降水的沈阳某工程基坑降水研究

RESEARCH ON EXCAVATION DEWATERING OF A PROJECT IN SHENYANG BASED ON TUBE-WELL DRAWDOWN
原文传递
导出
摘要 降水工程是基坑工程中的一项临时工程,若设计与施工不当易产生流砂、管涌、坑底隆起、边坡失稳、坑壁坍塌等事故。针对沈阳某工程所在区域地下水的特点,对其高层住宅深基坑降水采用管井井点降水方法。该方案的设计与施工,是根据土层的渗透系数,要求降水的深度和工程特点,经技术和经济综合比较后而确定。 Dewatering project is a temporary project of excavation engineering.If the design and construction are improper,lots of accidents are easy to occur,including quick sand,piping,bottom heave,instable slope,etc.Based on the features of groundwater under a project in Shenyang,the method of tube-well drawdown was used for the excavation dewatering of a high-rise housing.The design and construction of the project were determined after a comprehensive comparison of technology and economy,according to the permeability coefficient of soil,required dewatering depth and engineering characteristics.
出处 《工业建筑》 CSCD 北大核心 2010年第S1期1044-1046,1066,共4页 Industrial Construction
关键词 降水工程 深基坑 管井井点降水 设计与施工 dewatering project deep excavation tube-well drawdown design and construction
  • 相关文献

参考文献4

二级参考文献4

  • 1.JGJ79-2002:建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002..
  • 2刘竹溪.水泵及水泵站[M].北京:水利电力出版社,1984.
  • 3袁开先.水文地质学[M].北京:水利电力出版社,1984.
  • 4JGJ 120-1999.建筑基坑支护技术规程[S],1999.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部