摘要
根据宝钢滩涂区域配套动力干管工程氮气管道连续跨河、跨铁路的大跨度安装,介绍大跨度管道安装采用水平滑移的施工技术措施,供相应类似管道工程施工参考。
According to the long-span erection of Nitrogen pipeline of the trunk works in Baosteel beach area,which is continuously crossing river and railway,it is presented the technical measures for horizontal slip erection of long-span pipeline,which may a reference for construction of similar pipelines.
出处
《工业建筑》
CSCD
北大核心
2010年第S1期1117-1119,1106,共4页
Industrial Construction
关键词
管道
大跨度
水平滑移
方案
技术措施
pipeline
large span
horizontal slip
program
technical measures