通过介绍尾管总成采用环氧树脂固定在船体尾柱里取得的满意效果,详细阐述了运用新工艺将"轴系总段对中"原在水下对中的工序前移到(船台)船坞里实施,缩短了码头周期和建造周期.
This paper introduces the new technology was acquired safitying effect for stern tube assembly by pouring epoxy resin to fixed in stern post.and then detail expatiates the new technology for shafting aligment from the launching changed in the (slipway) duck , This new technology was shortened the wharf and building period .