期刊文献+

新技术、新工艺在西气东输二线施工中的应用

Application of New Technology in Second West to East Gas Pipeline Project
下载PDF
导出
摘要 技术进步是推动社会发展的动力,不断提高施工技术水平,大量采用新技术、新工艺是提高管道工程施工效率的重要手段。在西气东输二线工程建设中,结合自身的实际状况,推广应用了多项新技术、新工艺,包括STT+半自动焊技术、RMD+半自动焊技术、NORSET全自动根焊+半自动焊技术、CRC管道全位置自动焊技术等,取得了很多成果。 Technical advancement is the motivity of social development. To raise technical level continuously and use new techniques and processes in large scale is the important means of increasing pipeline construction efficiency. In the construction of Second West to East Gas Pipeline Project, many new welding techniques and processes such as STT plus semi-automatic welding, RMD plus semi-automatic welding, NORSET fully automatic welding plus semi-automatic welding and CRC all position automatic welding are applied and lots of results are obtained.
作者 林金河
出处 《石油工程建设》 2010年第S1期264-265,312,共3页 Petroleum Engineering Construction
关键词 西气东输 技术进步 新技术 新工艺 west to east gas transmission technical advancement new technique new process
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部