摘要
完善仪表及联锁的设计和加强生产管理,保证大型机组长周期安全平稳运行。保证联锁方案的合理设置和联锁仪表的可靠安装,试车阶段的各项功能和指标的实验及记录等。
It is described that perfecting the instrument interlock design and strengthening management by cases,to keep long period safe and stationary operation for the large unit.The interlock scheme must be reasonable,and the instruments are accurately installed.The experiment and record would be made during the trial run period.
出处
《中国仪器仪表》
2010年第S1期186-188,200,共4页
China Instrumentation
关键词
自动控制
联锁
大型机组
事件顺序记录
继电器
电液转换器
Automatic control Interlock Large unit Sequence of event Relay Electro-hydraulic converter