摘要
介绍了银丽华商业中心后加雨篷的设计过程。在已完成的建筑物上增加荷载,可通过合理的传力途径加以消化,避免对原有结构的加固及敲掉重建。
Through the design process of adjoining canopy to the Yinlihua Commercial Center,this paper introduced ways to absorb additional loads onto finished building by selection of reasonable routes of force transfer,while staying away from reinforcement or restore of the original structural members.
出处
《建筑结构》
CSCD
北大核心
2010年第S1期60-61,共2页
Building Structure
关键词
雨篷
合理的传力途径
加固
canopy
reasonable route of force transfer
reinforcement