摘要
基坑围护结构必须为规划地铁隧道预留穿越条件。经过方案比选,采用了短地下连续墙叠合长SMW工法桩的特殊围护形式。通过采取有针对性的技术措施,成功完成了基坑施工和穿越条件预留。
The supporting structure of deep foundation must prepare the transit condition for programming metro tunnel.Through comparing the projects,the special supporting structure that adopt short diaphragm wall and long SMW pile at the same time.Through adopting exactly technology,the construction of deep foundation and the preparative of metro transit were solved successfully.
出处
《建筑结构》
CSCD
北大核心
2010年第S1期317-318,247,共3页
Building Structure
关键词
特殊围护
预留
盾构
深基坑
special supporting structure
preparative
shield machine
deep foundation pit