基于AHP-FCE模型的桥梁设计风险评估研究 被引量:20

The risk assessment of bridge design based on the AHP-FCE model
下载PDF
导出
摘要 由于桥梁在设计过程中存在的风险未经过很好的识别与防范,导致由于工程设计原因造成的重大事故屡见不鲜。按照桥梁设计的基本生命周期进行设计风险划分,提出桥梁的设计风险评价指标,并且基于层次分析法(AHP)结合专家打分建立各指标的权重,再利用模糊综合评价法(FCE)建立模糊评价集,并利用zadeh算子对设计风险概率和设计风险损失进行计算,进而根据风险评估矩阵得到桥梁的设计风险水平。作为实例,运用AHP-FCE模型对灵江大桥的桥梁设计风险进行了分析评估。 As many risks have not been identified and prevented during the design stage of bridges,result in that a lot of accidents and serious events caused by improper design or design fault often occur.In accordance with the basic life circle of bridge design,this paper divided the design risks into four phases:design concept stage,design planning stage,design implementation stage and the design of the ending phase.The evaluation indexes system of bridge design risk is proposed.Based on Analytical Hierarchy Process(AHP),weightings of risk factors are determined.Then the fuzzy evaluation matrix can be get by using Fuzzy Comprehensive Evaluation(FCE).The Zadeh operator can be used to calculate the risk probability and risk loss values for the design risks of the bridge.As an example of engineering application,the risk level and grade of the bridge design are evaluated by the proposal AHP-FCE method according to practical condition of the Ling River Bridge design.The results show the presented method can effectively analyze and assess the bridge design risk.
出处 《土木工程学报》 EI CSCD 北大核心 2010年第S2期275-280,共6页 China Civil Engineering Journal
基金 浙江大学学科交叉预研基金(2009-12)
关键词 桥梁工程 设计风险 层次分析法(AHP) 模糊综合评价法(FCE) Zadeh算子 风险损失 bridge engineering design risk Analytical Hierarchy Process(AHP) Fuzzy Comprehensive Evaluation(FCE) Zadeh operator risk loss
  • 相关文献

参考文献12

  • 1林辉,陈艾荣.基于性能的桥梁反恐设计方法研究[J].同济大学学报(自然科学版),2009,37(8):999-1002. 被引量:11
  • 2张婷婷,项贻强,朱汉华,金福根,孙筠,张厚泉,李威.桥头跳车对行车安全性影响的模糊评价[J].江南大学学报(自然科学版),2009,8(2):212-217. 被引量:4
  • 3Nikolaou S,Mylonakis G,Edinger Pet al.Evaluation of site factors for seismic bridge design in New York city area. Journal of Bridge Engineering . 2001
  • 4Williamson E B,Winget D G.Risk management and design of critical bridges for terrorist attack. Journal of Bridge Engineering,ASCE . 2005
  • 5Wang Zengzhong,Wang Junjie,Fan Lichuet al.Risk analysis and management of ship collisions with bridges. Transportation and Development Innovative Best Practices . 2008
  • 6Tiryaki F,Ahlatcioglu B.Fuzzy portfolio selection using fuzzy analytic hierarchy process. Journal of Information Science . 2009
  • 7Luna R,Hoffman D,Lawrence W T.Estimation of earthquake loss due to bridge damage in the St.Louis Metropolitan area.I:Direct Losses. Natural Hazards Review . 2008
  • 8Molenaar K R,Bogus S M,Priestley J M.Design/Build for water/wastewater facilities:state of the industry survey and three case studies. Journal of Management . 2004
  • 9Alexandris A P,Protopapa E A,Papastamation D J.A highway section close to an active fault seismic risk assessment and design consideration. Geotechnical Engineering for Transportation Projects . 2004
  • 10Y.M. Wang,T.M.S. Elhag.Fuzzy TOPSIS method based on alpha level sets with an application to bridge risk assessment. Expert Systems With Applications . 2006

二级参考文献17

共引文献13

同被引文献161

引证文献20

二级引证文献180

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部