摘要
世博园区内VIP浮码头在防汛墙前设趸船1座,钢引桥2座;驳岸后方设桥墩2座。整个项目分为陆域和水域两个部分施工。介绍了总体施工流程、钻孔灌注桩施工技术、趸船加工制作工艺及水电安装施工等,保证了顺利完工。
The VIP floating dock in Expo 2010 Shanghai China includes a pontoon,two steel approach bridges at the front of flood wall and two bridge piers in the rear.General construction process,construction technology of bored piles,fabrication and installation technology and construction of water and electronic devices are introduced.Thus the project is success-fully completed.
出处
《施工技术》
CAS
北大核心
2010年第S2期1-4,共4页
Construction Technology